Node pre-deployment checklist

Snape 1.0 and StandaloneVersion 1.1 · 6 November 2026KC-01-002-S1
This guide is for Snape 1.0. Other versions: Snape 2.0.

ACKCIO NODE · Complete the Gateway pre-deployment checklist before you start

1Device Setup

  • Fix the antenna securely to the node: antenna must be vertically oriented at all times
  • Insert ER34615 3.6V 19Ah D-cell batteries manufactured within the last 3 months. Recommended brands: Saft, Tadiran, Eve · Do not use old or discharged batteries

2Firmware

  • All nodes come preloaded with latest firmware: no action needed

Notice · DG nodes onlyInstall the sensor manufacturer's specific firmware onto the DG node before commissioning.

3Prepare the Ackcio Nimbus App

  • Download latest Ackcio Nimbus App from Google Play Store: requires Android 8.0 or above
  • Ensure Gateway Snape setup is completed with Project created before proceeding

Via Gateway WiFi Hotspot

1. Connect Android to Gateway WiFi (e.g. Ackcio_Beam_XXXX: XXXX = GW ID)

2. Open Nimbus App → select HTTP

3. Enter: http://192.168.0.10 → download project

Via Remote.it (internet)

1. Both Android & Gateway must have internet

2. Open Nimbus App → select HTTPS

3. Use Remote.it link (COQ/Snape → Settings → Remote Tile) → download project

4Follow Commissioning Guide

  • Watch the commissioning video for your node and sensor before you start. Pick your node type to see its videos:

5Run Network Test (MANDATORY)

  • Node must detect at least 2 nearby devices (nodes or the Gateway) before being fixed in position

If NO devices found: DO NOT drop the node! Elevate the node/antenna or add a repeater between node and nearest GW/node. Never permanently fix a node with zero nearby devices.

6Sync Project with Gateway

Auto-sync (no action needed)

Nodes auto-sync when Nimbus App is connected to Gateway WiFi hotspot or Remote.it link during commissioning.

Manual sync required

If auto-sync did not occur: connect Nimbus App to Gateway WiFi hotspot or Remote.it link, then tap 'Project Sync' (in red) → wait for red indicator to disappear.

Without syncing, the Gateway will NOT recognise the commissioned nodes.

Node Installation Best Practices

Antenna & Signal

  • Antenna vertically oriented always
  • ≥ 18 in from metal · ≥ 12 in from other antennas
  • Run noise/network test via Nimbus App before fixing

Deployment & Enclosure

  • Deploy closest to GW first, work outward
  • Verify each mesh link before moving on
  • Use Ackcio brackets & weatherproof enclosure

Failure to follow this checklist may result in poor signal or failed GW-Node connection. Contact the Ackcio technical team at support@ackcio.com if unclear.

All steps completed? Your Node is commissioned and ready!